05/29/2020 IL Route 31 / Huntley Road Construction Update

Form Sidewalk and Driveway Apron on IL Route 31, North of Huntley Road
Installation of a Handhole for the Electric Wiring for the Traffic Signal
Installation of the Foundation for the Traffic Signal Post and additional Conduit for Signal Wiring

This week sidewalk, concrete driveway and traffic signal installation work began.   Next week work will continue on sidewalk, concrete driveways and traffic signal work.