10/4/2019 IL Route 31 Construction Update

North Lincoln Avenue Concrete Pour
Retaining Wall NW Corner of IL Route 31 and Huntley

Utility relocation work is continuing on IL Route 31. Sections of the retaining wall located at the NE corner of IL Route 31 and Main Street is continuing to be constructed.   Curb and gutter on Lincoln Avenue has been completed on both the North and South sections of Lincoln Avenue.  Concrete driveways and sidewalk will be pour done both North and South Lincoln Avenue. After completion of the driveways and sidewalk on Lincoln Avenue, asphalt will be placed on Lincoln Avenue.  Preparation of the roadway base on Huntley Road, west of IL Route 31, is continuing.